Forrige Neste
Solgt
10.09.19
# med bud
21
PRODUKTDETALJER
Måleravlesning
0 Miles


See Spec Sheet & MTR's attached below Documentation.

Loadout Charges:
$250.00/Truck if pipe is to be loaded nested. If the pipe is to be stripped loaded there will be an additional charge of $100/Truck. Trucks are to supply dunnage.

Hours of Operation:
Loadout must be scheduled 24-hours in advance between 7am - 2pm, Monday thru Friday. If truck arrive after 2 they will be loaded the following day. There will be no loading after 3pm. If any empty trucks remain after 3pm they will be loaded the following day.

Trucks will be loaded on a first come first serve basis.

If you have any questions or would like to inspect please contact:
David Fondren
dfondren@rbauction.com
(832) 702-4395



Inspeksjonsrapport



Vær oppmerksom på at du byr på et produkt som tilbys uten IronClad Assurance®. Bare grunnleggende detaljer om varetilstand gis for din vurdering i en kjøpsbeslutning.

Denne varen tilbys< span klasse = "varsel"> som er, hvor-er uten IronClad forsikring, og en kjøper kan ikke bestride tilstanden til varen. IronPlanet påtar seg intet ansvar for tilstanden eller beskrivelsen av dette elementet. Varen inkluderer ikke beskyttelse som tilbys av IronClad Assurance. En kjøper kan IKKE sende et tvistekrav knyttet till varen.


Ekstra bilder
(16)
 
KAN IKKE BESTRIDES